How long does it take to cross the Danyang-Kunshan Grand Bridge China?

This bridge is also considered part of the Beijing-Shanghai High Speed Railway. Since completion of this bridge, travel time from Ningbo to Jiaxing has reduced from 4.5 hours to just 2 hours!…Danyang–Kunshan Grand Bridge.

Construction started Early 2006
Average width 260 feet (80 meters)
Location Yangtze River Delta Jiangsu Province, China

In which country the Danyang-Kunshan Grand Bridge is located?

China
Danyang-Kunshan Grand Bridge | bridge, China | Britannica.

Who built the Danyang-Kunshan Grand Bridge?

Designer. The China Road and Bridge Corporation (CRBC), a subsidiary of China Communications Construction Company designed and built the bridge. It is a Chinese government-funded company which was originally part of the Foreign Aid Office of the Ministry of Communications of China.

What is the purpose of Danyang-Kunshan Bridge?

The primary purpose of the Danyang-Kunshan Grand Bridge is to transport people as part of the Beijing-Shanghai High Speed Railway. The bridge also hosts cars and commercial vehicles in some areas.

Where is the Danyang Kunshan?

Shanghai
NanjingJiangsu
Danyang–Kunshan Grand Bridge/Location

Why was the Danyang-Kunshan Grand Bridge built?

The Danyang-Kunshan Grand Bridge was built to transport trains on one of China’s premier high-speed railways over an incredible distance. Distance is a constant obstacle in bridge design (perhaps the primary obstacle) and something that every massive bridge has to compensate for.

When was the Danyang-Kunshan Grand Bridge created?

June 30, 2011Danyang–Kunshan Grand Bridge / Date opened

When did the Danyang-Kunshan Grand Bridge open?

June 30, 2011Danyang–Kunshan Grand Bridge / Opened